|
King Kennedy AMP Energy Efficiency Project
King Kennedy AMP Energy Efficiency Upgrades - Funds Awarded: $1,073,774
Total Percentage of Energy/Water Savings: 40.19%
Total Energy Saved: 4,225,942 MBtu
Annual Energy Savings: $96,385
King Kennedy North High Rise:
- Windows
- 90% Complete
- Scheduled for Completion by November 2011
- Boiler Replacement
- 90% Complete
- Scheduled for Completion by November 2011
SUMMARY OF IMPROVEMENTS
- Add metering for measurement and verification of energy and water consumption
Benefit: Measurement and Verification of Energy and Water Consumption for real-time monitoring and control of energy and water usage
- Replace 6 existing 82% efficient boilers and replace 3 existing 79% efficient hot water heaters with 95% efficient condensing boilers and modern controls
Energy Saved (MBtu): 1,335,520
- Replace 638 existing metal frame double hung clear pane windows with insulated vinyl frame windows with low-E glass
Energy Saved (MBtu): 2,890,422

|