search home E-NEWSLETTER SIGN-UP Continue to newsletter sign-up

English Fran&231;ais Italiano Español Português Pyсско Thursday, May 17, 2012

CMHA
Police

King Kennedy AMP Energy Efficiency Project

 

King Kennedy AMP Energy Efficiency Upgrades - Funds Awarded: $1,073,774

 

Total Percentage of Energy/Water Savings: 40.19%

 

Total Energy Saved: 4,225,942 MBtu

 

Annual Energy Savings: $96,385

 

King Kennedy North High Rise:

 

  • Windows
    • 90% Complete
    • Scheduled for Completion by November 2011
  • Boiler Replacement
    • 90% Complete
    • Scheduled for Completion by November 2011

 

SUMMARY OF IMPROVEMENTS

  • Add metering for measurement and verification of energy and water consumption
    Benefit:  Measurement and Verification of Energy and Water Consumption for real-time monitoring and control of energy and water usage
  • Replace 6 existing 82% efficient boilers and replace 3 existing 79% efficient hot water heaters with 95% efficient condensing boilers and modern controls
    Energy Saved (MBtu):  1,335,520
  • Replace 638 existing metal frame double hung clear pane windows with insulated vinyl frame windows with low-E glass
    Energy Saved (MBtu):  2,890,422

 

 

CUYAHOGA METROPOLITAN HOUSING AUTHORITY

8120 Kinsman Road Cleveland, Ohio 44104

Telephone: (216) 348-5000 Fax: (216) 348-4925

© 2012 CMHA All Rights Reserved.

home sitemap feedback privacy policy webmaster