search home E-NEWSLETTER SIGN-UP Continue to newsletter sign-up

English Fran&231;ais Italiano Español Português Pyсско Saturday, February 04, 2012

CMHA
Police

Technical Support Program

 

Through the Energy Performance Contract, CMHA has made a significant capital investment in state-of-the-art energy efficient central heating systems at our high-rise buildings and high efficiency furnaces at our family properties and scattered site homes.

 

To protect that investment by ensuring that this new equipment performs at peak efficiency, and its asset life is maximized, CMHA has entered into a Technical Support Program (TSP) with Siemens Building Technologies.  Here are some of the key provisions of our TSP.

 

  • Annual inspection of mechanical components and preventative maintenance procedures for central heating boilers and residential furnaces
  • Annual start up and shutdown inspections and preventative maintenance procedures for air cooled chillers at our high-rise buildings
  • Annual software calibration procedures for the Building Automation Systems installed at our high-rise buildings
  • Ongoing educational opportunities for our maintenance staff
  • Annual Building Automation Systems software upgrades
  • Remote 24/7 Building Automation Systems monitoring to warn of specific alarm conditions
  • Emergency online and onsite 24/7 repair response
  • Training of CMHA's maintenance staff in the operation and control of the new energy efficient heating boilers and Building Automation Systems which installed at many of our high-rise buildings

 

In October 2007, CMHA Firemen and Assistant Firemen took part in the first of a series of training opportunities on our new heating systems at an actual installation at our Riverview Tower high-rise building.

 

A component of the Technical Support Program (TSP) is an annual furnace check and filter change. Here a Siemens technician changes a residential furnace filter with a highly efficient pleated filter.

 

This TSP is designed as a flexible service contract which consists of five one-year agreements with a menu of service components.  The TSP is cancelable at the end of any of the five service agreement years.

 

CUYAHOGA METROPOLITAN HOUSING AUTHORITY

8120 Kinsman Road Cleveland, Ohio 44104

Telephone: (216) 348-5000 Fax: (216) 348-4925

© 2012 CMHA All Rights Reserved.

home sitemap feedback privacy policy webmaster